Process design
HRT, organic loading and working volume: three checks for digester sizing
Why a tank diameter or a standard retention period cannot establish whether a proposed digester is correctly sized.
Compressed biogas / Engineering / Advisory
From feedstock and feasibility to equipment, execution and plant operation. Practical engineering advice, supported by research and a clear understanding of the project.

The knowledge desk
Featured technical guide
Follow the units from a laboratory BMP result to wet-feed methane potential. See where operating evidence is still needed before making a production commitment.
A calculation framework, with illustrative assumptions and linked research.
Engineering & execution
Establish whether the feedstock, site, gas market and project economics support an investible CBG project before committing to plant capacity or equipment.
Explore scope ↗02Build a supply plan around material that can be collected, stored and fed consistently, with quality and delivered cost under control.
Explore scope ↗03Review the interfaces between biological design, civil works, machinery, utilities and gas delivery before they become construction or operating problems.
Explore scope ↗04Coordinate engineering, procurement and construction around a defined feedstock basis, clear package boundaries and an agreed commissioning programme.
Explore scope ↗Quantity, quality & storage
Loading, retention & mixing
Quality, recovery & power
Storage, offtake & logistics
Treatment, nutrients & dispatch
A process overview. Equipment selection follows the verified feedstock and delivery requirements.
Technical reading
Process design
Why a tank diameter or a standard retention period cannot establish whether a proposed digester is correctly sized.
Gas systems
How to connect continuous gas production with shorter upgrading shifts, maintenance interruptions and the usable range of a gas holder.
Project economics
How to compare EPC offers and identify costs that can sit outside the quoted plant package.
Plant references
United Kingdom
An independently published operating-plant example of agricultural feedstock integration and gas-grid supply.
2 min read ↗02Germany
An operator-reported example linking gas production, liquefaction and downstream fuel infrastructure.
2 min read ↗03India
A documented municipal Bio-CNG example showing why collection quality, processing and offtake need to be designed together.
2 min read ↗Independent reference facilities. These studies are not presented as Altpreneur project credentials.
Work with Altpreneur
Feedstock and project assessment
Apply this to your project
We can help define the next study, engineering review or operating intervention.